
New TopShim run:

version = topshim 2.1.0
date = 2025-01-15
time = 18:32:14.813
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration 2: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.279

shim changes: 
Z	-118
Z2	-32
Z3	-72
Z4	+85
Z5	-113
Z6	-372
Z7	-435
Z8	+6640

duration = 50 sec
completed successfully
finished Wed Jan 15 18:33:03 2025


========================================================================
