
New TopShim run:

version = topshim 2.1.0
date = 2023-03-10
time = 02:29:48.934
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration 1: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 2: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 4: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.366

shim changes: 
Z	-339
Z2	-37
Z3	+65
Z4	-253
Z5	-270
Z6	-173
Z7	+2612
Z8	+1302

duration = 1 min 26 sec
completed successfully
finished Fri Mar 10 02:31:13 2023


========================================================================
