
New TopShim run:

version = topshim 2.1.0
date = 2023-11-21
time = 21:56:25.705
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration 1: FWHM Before= 7.4 Hz, Target= 0.3 Hz, After= 0.8 Hz
Iteration 2: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 3: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.406

shim changes: 
Z	-449
Z2	-37
Z3	+53
Z4	+366
Z5	-509
Z6	-2502
Z7	+4002
Z8	+14016

duration = 1 min 7 sec
completed successfully
finished Tue Nov 21 21:57:31 2023


========================================================================
