
New TopShim run:

version = topshim 2.1.0
date = 2023-12-05
time = 04:13:20.395
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 2.3 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration 2: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 4: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 6: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 1.0 Hz
Iteration 7: FWHM Before= 1.0 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration 8: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.6 Hz
Iteration 9: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, non-spinning) = 0.505

shim changes: 
Z	-5
Z2	-48
Z3	-49
Z4	+168
Z5	+77
Z6	-1356
Z7	-546
Z8	+9681

duration = 2 min 22 sec
completed successfully
finished Tue Dec  5 04:15:41 2023


========================================================================
