
New TopShim run:

version = topshim 2.1.0
date = 2023-11-21
time = 19:03:04.261
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration 1: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration 2: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.388

shim changes: 
Z	-72
Z2	+28
Z3	+18
Z4	+45
Z5	-165
Z6	-308
Z7	+182
Z8	+3159

duration = 1 min 9 sec
completed successfully
finished Tue Nov 21 19:04:11 2023


========================================================================
