
New TopShim run:

version = topshim 2.1.0
date = 2024-05-14
time = 15:45:12.462
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration 2: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration 4: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 5: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration 6: FWHM Before= 0.2 Hz, Target= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, non-spinning) = 0.258

shim changes: 
Z	-330
Z2	-30
Z3	+230
Z4	+38
Z5	-328
Z6	-2203
Z7	+3385
Z8	+6812

duration = 1 min 43 sec
completed successfully
finished Tue May 14 15:46:54 2024


========================================================================
