
New TopShim run:

version = topshim 2.1.0
date = 2023-03-07
time = 21:31:37.559
command = topshim 

FINE SHIMMING

Parameters:

probe = Z154039_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration 1: FWHM Before= 1.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 2: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration 3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration 4: FWHM Before= 0.2 Hz, Target= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, non-spinning) = 0.294

shim changes: 
Z	-491
Z2	-69
Z3	+48
Z4	+185
Z5	-368
Z6	-2481
Z7	+4225
Z8	+14209

duration = 1 min 14 sec
completed successfully
finished Tue Mar  7 21:32:49 2023


========================================================================
